30 APRDashboard v2 cockpit shipped. Brief-as-hero, collapsible folder nav, tile-based active tasks with Start + Submit, Why? panels on strategic tasks, owner filter bar.
29 APRWorkspace fully migrated to Google Drive. Cowork rewired. OneDrive copy retained as backup.
29 APRGoogle Workspace (Business Starter) live under straxor.com. Aliases: christine@, hello@. Email auth (SPF + DKIM + DMARC) configured.
29 APRDaily 6am briefing scheduled. Reads canonical state + shared Sheets via Drive MCP. Waits for Christine's reply before updating.
29 APRDrive MCP connector verified end-to-end. Read access confirmed. Sheet writes (option C) deferred until write-capable connector exists.
28 APRWorkspace reorganised into numbered folder system. Dashboard is now the entry point.
28 APRAll 9 BUILD Scorecard build decisions locked. Ready for Shane to start.
28 APRPricing Calculator stays free (moved to Tier 0). First paid product becomes the Baseline Audit Workbook.
28 APRNDIS platform parked behind 4 gates (legal, employer, exit plan, capital). Not killed.
24 APRStraxor Level 1 architecture locked (BUILD / CORE OS / BDM + Programs / Tools).