STRAXOR
Build Dashboard · v2 cockpit
Last updated: 5 May 2026
Today's briefing 5 May 2026, 6:03am
Good morning Christine. Today is Tuesday, 5 May 2026.
Current focus
All five tool accounts are now live and dashboard.straxor.com is serving from Vercel — setup phase is officially closed. BUILD Scorecard moves from "open accounts" to actually building. Shane's Framer landing-page draft is in flight; ScoreApp question loading is the next critical-path task.
What changed in your shared docs since yesterday
No changes in the Drive Sheets — todo-list and build-scorecard-status last touched 29 April. The canonical work log got a fresh 5 May entry covering Shane's Framer / Kit / ScoreApp signups, your Calendly signup, the Vercel CNAME verification, and the dashboard tile cleanup. Nothing to reconcile from the Sheets side.
Recommended next action today
Configure your Calendly availability windows (Tue/Thu 1–3pm per the locked plan). It's your only open setup task and takes ~15 minutes. Once done, the Scorecard end-to-end handoff to Shane is unblocked — Calendly link can be wired into the post-quiz flow whenever he's ready.
Anything flagged
Lawyer search still not started — continues to gate CORE OS launch and the NDIS reconsideration. No urgency for the BUILD build, but it runs in parallel. Logo SVG conversion still queued for a focused chat. status.md still shows the launch essay as "Not started" though v1 was drafted 30 April — will correct once you confirm in chat.
Show:
Critical Christine

Find an IP / employment lawyer in NSW

Gates CORE OS public launch + the NDIS platform reconsideration. Book the appointment within 2 weeks.

Why this matters
Recommended actionSearch NSW employment-and-IP lawyers (LawSociety NSW directory, Lawpath, or referral). Brief them with 07_legal-and-employer/lawyer-brief.md.
Why now?CURE was created by Shane during employment, at the employer's request, with no written IP assignment. CORE OS sits on contested IP. Until a written legal opinion clears the position, public CORE OS launch carries real legal risk and the NDIS platform option stays parked.
Alternatives consideredProceed without legal advice — rejected. The covert path is the worst path; NDIS is small, the employer will find out, adversarial discovery is the worst scenario.
▶ Open brief
Critical Both

Take lawyer brief + both contracts to appointment

Christine's BDM contract + Shane's support-worker contract + the prepared brief. Email aliases / written CURE-creation context optional but useful.

▶ Open brief
Active Christine

Click "Run now" on the 6am scheduled task

Pre-approves tool permissions for tomorrow's 6am run so it doesn't pause asking for clicks. One-time only.

Active Christine

Build Scorecard waitlist landing at straxor.com (Framer)

Single page using Business template or Blank + AI generator. Hero "You're not busy. You're disorganised." + email signup wired to Kit. Connect straxor.com root domain via DNS at VentraIP.

▶ Open Framer
Active Shane

Load 25 Scorecard questions into ScoreApp

Plus tooltips, scoring (0-3 per question), bands, and routing logic. Spec lives in 04_pillars/build/build-scorecard-v1.md.

▶ Open spec
Active Shane

Build the 5 routed report variants

One report per lowest-scoring letter (B / U / I / L / D). Output structure: verdict block, letter scores, biggest constraint, what's working, three things to fix first, routed recommendation.

▶ Open spec
Active Shane

Wire 5 email sequences in Kit

One sequence per lowest-letter outcome, triggered by tags from ScoreApp. 5 emails over 14 days each.

▶ Open spec
Active Shane

Build single-page Scorecard landing page

In Framer. Single page, hero block + one CTA: "Take the Scorecard." Embed ScoreApp.

▶ Open Framer
Active Claude

Draft launch essay — "You're not busy. You're disorganised."

1,000-1,400 words. Repurpose plan: 5 LinkedIn posts + carousel + 60-sec phone video + warm-network email.

Active Christine

Redline launch essay draft

Read aloud. Flag anything that doesn't sound like you. Movement over perfection.

Done — completed this week (19)
  • ClaudeConvert Straxor logo to SVG → 03_straxor-framework/straxor-logo.svg
  • ChristineRegister straxor.com + straxor.com.au at VentraIP
  • ChristineSet up Google Workspace under straxor.com (info@ as primary user)
  • ChristineAdd christine@ and hello@ as free aliases
  • ChristineEmail authentication: SPF + DKIM + DMARC records live
  • ChristineInstall Google Drive Desktop and sign in with info@straxor.com
  • ChristineMigrate workspace from OneDrive to Google Drive
  • ClaudeRe-point Cowork to the new Drive location and verify read/write
  • ClaudeSchedule daily 6am Straxor briefing task
  • ChristineConnect Google Drive MCP connector (info@straxor.com — verified)
  • ChristineUpload CSVs to Drive as Google Sheets (todo-list + build-scorecard-status)
  • ChristineInitial signups for Framer ($22/mo), Vercel (free), Kit (free), ScoreApp (trial → $55/mo), Calendly (free) — all monthly billing
  • ChristineCreate GitHub repo + push dashboard, connect Vercel auto-deploy from GitHub
  • BothAdd CNAME record at VentraIP for dashboard.straxor.com → Vercel (DNS propagating)
  • ShaneSign up for Framer + draft Scorecard landing page (5 May)
  • ShaneSet up Kit (ConvertKit) free account (5 May)
  • ShaneSet up ScoreApp account (trial) (5 May)
  • ChristineSet up Calendly free account (5 May)
  • BothHost dashboard at dashboard.straxor.com — live on Vercel (5 May)
Recent decisions (12)
1 MAY
Workflow protocol: single-workstream chats, file-based memory. Long multi-workstream threads close; new chats open per task. Canonical files persist context. 6am brief is the anchor.
1 MAY
Dashboard hosted on Vercel via GitHub auto-deploy. Source repo `straxor-dashboard` (private). Custom domain `dashboard.straxor.com` configured at VentraIP CNAME, awaiting Vercel verification.
1 MAY
Tool stack confirmed: Framer (marketing site), Vercel (apps/tools), Kit (email), ScoreApp (quiz), Calendly (calls). All monthly billing — escape hatches if any tool doesn't fit.
30 APR
Dashboard v2 cockpit shipped. Brief-as-hero, collapsible folder nav, tile-based active tasks with Start + Submit, Why? panels on strategic tasks, owner filter bar.
29 APR
Workspace fully migrated to Google Drive. Cowork rewired. OneDrive copy retained as backup.
29 APR
Google Workspace (Business Starter) live under straxor.com. Aliases: christine@, hello@. Email auth (SPF + DKIM + DMARC) configured.
29 APR
Daily 6am briefing scheduled. Reads canonical state + shared Sheets via Drive MCP. Waits for Christine's reply before updating.
29 APR
Drive MCP connector verified end-to-end. Read access confirmed. Sheet writes (option C) deferred until write-capable connector exists.
28 APR
Workspace reorganised into numbered folder system. Dashboard is now the entry point.
28 APR
All 9 BUILD Scorecard build decisions locked. Ready for Shane to start.
28 APR
Pricing Calculator stays free (moved to Tier 0). First paid product becomes the Baseline Audit Workbook.
28 APR
NDIS platform parked behind 4 gates (legal, employer, exit plan, capital). Not killed.
24 APR
Straxor Level 1 architecture locked (BUILD / CORE OS / BDM + Programs / Tools).
Notice